| Concrete Batch Testing:
As per AS1012.31 and AS 1012.8.1, three test cylinder samples are
taken at each pour. At month's end, three random samples
are sent to a NATA Registered Laboratory and tested for
minimum strength of 32MPa at 28 days. Top Load Testing: Testing of
all tanks in dedicated rig as per AS1546 to 510Kg. See image of Top Load Testing
here.
Side Load Testing: Testing of all tanks in
dedicated rig as per AS1546 to the following loads. See
image of Top Load Testing here.
- Tank empty – Load applied to straight edges of tank – 10.3kN
- Tank empty – Load applied to circular ends of tank – 5.05kN
- Tank filled with water – Load applied to straight edges of tank – 18.2kN
- Tank filled with water – Load applied to circular ends of tank – 8.95kN
Please contact us for
full load rating information.
Water Tightness Testing: All collection wells
remain in examination bed full of water for 28 days to
ensure full cure and no leakage.
|