This truck inspection site required a single booth facility on each side of the highway to service North and South bound traffic. A Pureablue CAB 1 sewer/septic building was installed, connected to settlement collection wells and rising main pumps pumping waste 1600 metres back to town sewer system.
     We specified to the client to arrange for a water service and rising sewer main in a common trench to be constructed connecting to town services. Under road boring for connection of these services to sites on the opposite sides of the road was also organised by the client. We then designed a collection well and rising main pump chamber system housed in a CWT AS1546 compliant chamber connecting the two toilet facilities to the water and sewer systems. Power was already at the site. The whole package of product was shipped to site and installed in one working week.